Applied reinforcements last week.  There are three layers of unidirectional tape down the spine of the curve.
300 gm/sqm cloth draped over beam.
The uni is visible under the eglass.  It will provide lateral stiffness.  I had to fair the edges in a bit as the stack of uni stood proud a couple of millimeters.
The glass covering physically locks all of the layers together to the main beam at the bottom.   More importantly, the glass provides a measure of toughness.  The foam with only a bit of fairing compound over it was quite fragile.  It would have been easy to poke a hole or ding it.  The fairing is now firm, but may still be vulnerable.
The second beam is now mostly shaped and the surface being faired.
Task time: 8 hours
Total project time: 854 hours
No comments:
Post a Comment