The template was made with a 3 inch hole saw.   This was slightly bigger than the 75mm washer and it left a bit of room for glue.  The template was aligned/centered by "stacking" the components.  The G10 tube went in the hole, the washer went over the tube and the template around the washer.
The washer dry fitted.
Task time: 3 hours
Total project time: 334 hours
No comments:
Post a Comment