I did do some prep for the next steps on the akas. Surface sanding and rounding over the edges. I have also been pondering the best methods to apply layers of strips of pultrusion and 400 gsm carbon double bias. These have to be clamped and/or vacuum bagged over the eighteen foot span.
A layer of five strips of pultrusion will look something like this only longer.
Current state of the beams.
Also got a stack of douglas fir ripped for the mainsheet beam laminations. These were a bit wet and will need to dry with the heaters and a fan for a while. Think I need a moisture gauge.
Task time: 8 hours
Total project time: 194 hours