Building a Brown/Bieker Proa

Construction of a 32 foot Jester Class Offshore Proa

Showing posts with label laminating jig. Show all posts
Showing posts with label laminating jig. Show all posts

Monday, February 24, 2014

Jigs for Laminating Aka Ends


Got these glued up and ready to go.  The top will be laid up against the right side of the left group. The bottom on the right side of the right. There is a lot of room for run out on this jig, so hopefully it will help scarf the plywood pieces to the laminated ends.

Task time: 2 hours
Total project time: 113 hours

Posted by Jak at 8:25 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Aka, laminating jig
Older Posts Home
Subscribe to: Posts (Atom)

Links

  • Bieker Boats
  • Turn Point Design
  • Edensaw
  • Goodwinds.com
  • Pegasus Aero Marine
  • Soller Composites
  • Fiberglass Supply
  • Composites West
  • ACP Composites
  • West System Epoxy
  • Proafile
  • Trimaran Projects
  • Outrigger Sailing Canoes
  • Ronald Groenewoud's Mini
  • ARPEX
  • Dean's Shilshole 27

Blog Archive

  • ▼  2016 (3)
    • ▼  September (1)
      • Peel Ply and Bonding Surface Preparation
    • ►  February (2)
  • ►  2015 (28)
    • ►  November (1)
    • ►  October (1)
    • ►  September (4)
    • ►  August (1)
    • ►  July (1)
    • ►  June (5)
    • ►  May (6)
    • ►  March (2)
    • ►  February (4)
    • ►  January (3)
  • ►  2014 (60)
    • ►  December (1)
    • ►  November (6)
    • ►  October (5)
    • ►  September (6)
    • ►  August (2)
    • ►  April (1)
    • ►  March (16)
    • ►  February (16)
    • ►  January (7)
(C) 2014-2015 Mang. Awesome Inc. theme. Powered by Blogger.