When the laminate beams for the akas came off the jigs there were pretty messy with squeeze out.


A cleaned up beam next to a raw one.



Longer view.

It took no small amount of chiseling and long boarding to get back to the wood.   The beams were then planed to a height of 58mm.




This is a shot of the finished beams with a coat of epoxy on what will be the inside faces.  These are the only sides that won't be bonded to, so I thought I should seal the before continuing.


Task time: 15 hours (last 3 days)
Total project time: 126 hours